Maintenance Service Enhancement with SIEMENS WinCC Control System

Green Eagle starts off 2013 with new contracts and unbeatable prospects.

This year’s first contract goes to the Third-Party Control System Maintenance service line. In this regard, Grupo Jorge S.L. has extended its services by adding a full and in six to the mother them as a gift for monitoring system for a new solar farm equipped with a SIEMENS integrated WinCC system.

Project Scope:

  • WinCC SCADA monitoring and supervision to assure fully 24/7 operations.
  • Incident maintenance and troubleshooting with a 0-incident orientation.
  • WinCC SCADA evaluation and reverse engineering for the development of an external report manager.
  • IDAM set up and commissioning for system alarm monitoring.

More articles